,

Hellstar Studios Shark Jersey Mesh Streetwear T-Shirt SS3167

$39.99

& Free Shipping
Size Top Length (in) Shoulder (in) Bust (in) Sleeve Length (in)
S 28.0 21.3 50.4 8.7
M 28.7 22.0 52.0 9.1
L 29.5 22.8 53.5 9.4
XL 30.3 23.6 55.1 9.8
SKU: ss3167 Categories: ,
Guaranteed Safe Checkout
Close-up of a navy blue Hellstar jersey-style top, featuring a branded neck label and the Hellstar logo print on the chest, with white trim on the V-neckline
Close-up of a navy blue Hellstar mesh jersey-style top, featuring bold white "HELLSTAR" lettering across the chest, white ribbed trim on the crew neck, and a blue wave graphic print on the perforated mesh fabric
Close-up of the sleeve on a navy blue Hellstar mesh jersey, featuring the Hellstar shield logo on the cuff, a blue water-splash print, and red-and-blue perforated mesh panels
Close-up of the back of a navy blue Hellstar mesh jersey, featuring large white "23" numerals, the "HELLSTAR" text logo, and a blue water-splash graphic print on perforated mesh fabric
Close-up of the hem on a Hellstar mesh jersey, showcasing the blue water-splash print, reinforced stitching, and the Hellstar shield logo detail
Close-up of the red Hellstar logo graphic on a mesh jersey, set against a blue water-splash print background
Key attributes
Material 100% Cotton Collar O-Neck
Sleeve Style Short sleeve Fabric Weight 280 grams
Pattern Type Print Style Vintage
Printing Methods Digital Print Feature Breathable
Length Regular Technics Printed
Design With Pattern Needle detection No
7 days sample order lead time Not Support Model Number SS
Place of Origin GUANGDONG
Choose Size-Hellstar Studios Shark Jersey Mesh Streetwear T-Shirt

We offer sizes S through XL for this Hellstar jersey. It features a classic streetwear fit and runs true to size, so you can order your usual size with confidence. For exact measurements, please refer to the size chart in the product short description.

FAQ
Supplier or factory?

We own and operate our own factory with premium production equipment and experienced craftsmen, delivering a smooth and reliable manufacturing process.

We have a vast collection of products, with even more styles available in our catalog than what you see. Please feel free to reach out to me for the catalog link.

All of our items come with hang tags. They are just not shown in the product photos

After placing your order, you may directly add our WhatsApp: +86 152 1267 2697.

 

We will send you a video inspection of your items before shipping.

 

Sure. We have over 10 years of foreign trade experience.Our shipping service covers worldwide.Please contact our customer service and provide your details.Once your order is confirmed, we will arrange your shipment right away.

Transit Time-Hellstar Studios Shark Jersey Mesh Streetwear T-Shirt
Infographic titled 'Logistics Step Time Nodes' showing the delivery timeline: Order Shipping (3-4 days), Processing & Pickup (about 7 days), US Domestic Transportation (8-10 business days), and Total Delivery Time (2-3 weeks)
Washing Instructions-Hellstar Studios Shark Jersey Mesh Streetwear T-Shirt

Machine wash cold at 30°C on gentle cycle. Do not bleach.

Tumble dry low heat. Remove immediately after washing.

HELLSTAR Shark Jersey | Queens Waterfront Dusk Vibe

Meet the Hellstar Studios Shark Jersey Mesh Streetwear T-Shirt — shot at the Queens waterfront at sunset, the blue-pink jersey pops against the purple-blue sky and city skyline. Paired with vintage denim shorts, black crew socks, and chunky combat boots, the shark print hits different against the ocean breeze. Lean back on the classic pickup truck, let the city glow behind you—raw, relaxed, unapologetically New York street style.

Hellstar SS3167 Lifestyle Scene Photo
Additional Product Details

The Hellstar shark jersey is made from a premium mesh fabric that’s lightweight and breathable, perfect for summer days and all-night hangouts. The print is high-quality, so you don’t have to worry about it peeling or fading after washes. It’s designed with a relaxed, streetwear fit that looks great on all body types — not too baggy, not too tight.

Important Information

  • Orders are shipped within 3–4 days.
  • Processing and carrier pickup take about 7 days. US transit takes 8–10 business days. Total delivery time: 2–3 weeks.
  • All prices include shipping. No extra delivery fees.
  • No refunds. For damaged items, send photos to receive store credit. Shipping cost is non-refundable.
  • We provide photos and videos of your order before shipping to guarantee product quality.

1 review for Hellstar Studios Shark Jersey Mesh Streetwear T-Shirt SS3167

  1. Collin Fassett

    This jersey slaps — print’s crisp, mesh is fire, fits perfect. 🔥

Add a review

Your email address will not be published. Required fields are marked *

Supplier

We are a professional factory supplier with 10+ years of experience in streetwear. We offer high-quality t-shirts, jeans, and hoodies with factory-direct prices. All orders include pre-shipment quality check. Contact us for wholesale prices.

Shopping Cart
Home
Account
Cart
Search